Why Odoo for Manufacturing?

Odoo MRP is a fully integrated manufacturing solution. Unlike standalone MRP systems, Odoo connects manufacturing to sales, purchasing, inventory, accounting, and quality in one platform. No integration headaches, no data silos, no double entry.

Key Manufacturing Modules

ModulePurposeEdition
MRP (Manufacturing)Manufacturing orders, BoM, routingCommunity + Enterprise
Quality ControlInspections, checkpoints, alertsEnterprise
MaintenancePreventive & corrective maintenanceCommunity + Enterprise
PLMProduct lifecycle, ECOs, versioningEnterprise
SubcontractingOutsourced manufacturingEnterprise
Shop FloorTablet interface for operatorsEnterprise

Bill of Materials (BoM)

A BoM defines what components and quantities are needed to manufacture a product.

# Example: Wooden Table
# Finished Product: Table (TBL-001)
# Components:
#   - Tabletop (TOP-001)    × 1
#   - Table Leg (LEG-001)   × 4
#   - Screws (SCR-001)      × 16
#   - Wood Finish (FIN-001) × 0.5 L

# BoM Types:
# - Manufacture: standard production
# - Kit: auto-explode into components on sales/delivery
# - Subcontracting: send to external manufacturer

Multi-Level BoM

Components can themselves have BoMs (sub-assemblies):

# Table (TBL-001)
# └── Tabletop (TOP-001) - BoM:
#     ├── Raw Wood Board × 2
#     └── Edge Banding × 4m
# └── Table Leg (LEG-001) - BoM:
#     ├── Raw Wood Dowel × 1
#     └── Rubber Foot Cap × 1

Manufacturing Orders

  1. Plan — Create MO (manually or from sales order/reorder rule)
  2. Check Availability — Verify all components are in stock
  3. Start Production — Begin work, consume components
  4. Quality Check — Inspect finished product (if quality module enabled)
  5. Produce — Mark as done, finished product enters stock

Work Centers & Routing

Work centers represent machines or workstations. Routing defines the sequence of operations:

# Routing for Table:
# Step 1: Cutting (Work Center: CNC Machine) — 15 min
# Step 2: Assembly (Work Center: Assembly Station) — 30 min
# Step 3: Finishing (Work Center: Paint Booth) — 45 min
# Step 4: Inspection (Work Center: QC Station) — 10 min

# Work Center capacity:
# CNC Machine: 2 tables per hour
# Assembly Station: 4 tables per hour
# Total: bottleneck is CNC at 2/hour

Planning & Scheduling

  • MPS (Master Production Schedule) — Forecast demand and plan production
  • MRP scheduler — Auto-generate purchase orders for missing components
  • Gantt view — Visual production scheduling by work center
  • Lead times — Manufacturing lead time + component procurement lead time

Quality Control

  • Quality checkpoints at each routing step
  • Pass/fail inspections with photo evidence
  • Quality alerts for failed inspections
  • Statistical process control (SPC)
  • Traceability: lot/serial → quality record → customer

Maintenance

  • Preventive: Schedule maintenance by time or usage (every 1000 cycles)
  • Corrective: Log breakdowns, track repair time
  • Integration: Equipment linked to work centers — maintenance blocks production scheduling

Real-World Workflow

  1. Sales team creates quotation → confirmed sale order
  2. MRP scheduler checks BoM → generates manufacturing order
  3. Missing components → auto-creates purchase orders for vendors
  4. Components arrive → receipt validated → available for production
  5. Manufacturing order starts → work orders assigned to work centers
  6. Operators use Shop Floor tablet interface
  7. Quality inspection at each step
  8. Finished product → delivery order → shipped to customer
  9. Invoice auto-generated → accounting journal entry